Horticulture :: Vegetables:: Annual Moringa
|
|||||||||||||
Varieties
PKM 1, PKM 2 and KKM 1
Soil
Annual moringa comes up well in a wide range of soil. A deep sandy loam soil with a pH of 6.5 – 8 is ideal for cultivating this crop.
Season
Planting is done during July – October
Seed Rate
500 g/ha of seeds are required. Sow two seeds per pit at a depth of 2.5-3.0 cm. The seeds can also be sown in the poly bags containing pot mixture and transplanted after 35 -40 days of sowing.
Preparatory cultivation
Dig pits of size 45 cm x 45 cm x 45 cm with a spacing of 2.0 - 2.5 m either way. Apply 15 kg of compost or FYM/pit after mixing with top soil.
High density planting and fertigation in moringa PKM 1
High density planting at 1.5 X 1.0 m spacing with two plants/hill and plant population 13,333 / ha along with the application of fertilizer dose of 135: 23 :45 g of NPK/pit (150%) through drip increases the yield of moringa. In this phosphorus should be applied basally as soil application. N and K can be applied in the form of urea and muriate of potash through drip.
After cultivation
Gap filling may be done within a month. Pinch off the seedlings when they are about 75 cm in height to facilitate more branching. Short duration vegetables like Cowpea, Bhendi and Tomato can be grown as intercrop.
Manuring
A fertilizer dose of 45:15:30 g of NPK/pit may be applied 3 months after sowing. Apply 45 g of N/pit after 6 months when the crop is in bearing.
Irrigation
Irrigate before sowing and on the 3rd day after sowing and subsequently at 10 – 15 days interval according to soil type.
Plant protection
Pests
Moringa pod fly management
Soil application of Thiamethoxam 25 WG @ 200g a.i. / ha on 150, 180 and 210 days after planting; placement of fermented tomato fruit trap @ 25 / ha; and need based foliar spray of Spinosad 45 SC @ 56g a.i. / ha followed by Profenophos 50 EC@ 250g a.i. / ha.
Bud worm, leaf caterpillar and leaf webber: Dust Carbaryl 10 D @ 25 kg/ha or spray Carbaryl 50 WP @ 2 g/l.
Hairy caterpillar
Use flame torch when the caterpillars settle on the tree trunk.
Ratoon crop
Cut back the trees at 90 cm from ground level after the harvest is over. In another 4 – 5 months, plants will again come for harvest. Ratoon crops can be taken for 3 years. Apply the fertilizer dose of 45:15:30 g NPK/plant, within a week after cutting back along with 25 kg of FYM or compost every year.
Yield
50 - 55 tonnes of pods/ha (220 pods/tree/year).
Market Information
|
Agriculture Information, Agriculture News, Agriculture jobs in India
Sunday, 9 March 2014
Horticulture :: Vegetables:: Annual Moringa
Subscribe to:
Post Comments (Atom)
Thanks for Posting this, Very Useful Info.
ReplyDeleteOrganics Mantra is pleased to offer you naturally produced Vegetables, fruits, groceries & other day to day items at your door-step. We have hand-picked products in our inventory & will keep adding more.
Online Vegetables